Public hearing set for 500kw UCO-based power project with FIT in Canada

In Canada, C3 Acquisition plans to install two electric generators that it will power with used cooking, grease and fats to produce 500kw that will be sold to the national grid under a feed in tariff. A public hearing is being held in Smith Falls where the facility is planned in order to secure the required permits. The project has already signed a 20-year FIT with the Ontario Power Authority. On site storage will include tanks for up to 80,000 liters for fuel production.

This entry was posted in Biodiesel Report. Bookmark the permalink.